![]() |
#11 |
Pure Bacon
Join Date: Jan 2007
Location: Trenton, Oh
Posts: 1,098
|
Boat sides are coming along , got the passenger side tacked in and the floor welded up , still have to finish the ends and fill in some of the areas inside.
![]() ![]() ![]() headed to Red9 Fab. this afternoon for some tube and will start on the cage soon ..... Thinking about dove tailing ....... hummmmm ! |
![]() |
![]() |
|
|